Product Center

1000+ specifications and models to meet various electrical engineering needs

Current Display30Each category represents a product, totaling 700model
Specialty Cables
Lead Time: 7-15 days
Specialty Cables | Custom Non-Standard Solutions | Wire Harness Fabrication

Specialty Cables

Specialty cables designed for extreme conditions such as high temperatures, corrosion resistance, radiation resistance, and high flexibility, coveringPTFEHigh-temperature cables, silicone rubber cables, compensation wires, shielded special-purpose cables, and more.
Request a QuoteView details
Customized Solutions
Lead Time: 7-15 days
Specialty Cables | Custom Non-Standard Solutions | Wire Harness Fabrication

Customized Solutions

Custom-built to customer drawings and operating conditions. Full customization of wire gauge, conductor material, insulation, shielding structure, color, and printing.
Request a QuoteView details
Wire Harness Processing
Lead Time: 7-15 days
Specialty Cables | Custom Non-Standard Solutions | Wire Harness Fabrication

Wire Harness Processing

One-stop wire harness processing services including terminal crimping, soldering, injection molding, and assembly testing. Finished harnesses delivered ready for final product assembly.
Request a QuoteView details
H07V2-U PVC 450/750V Wire
Lead Time: 7-15 days
VDE German Standard

H07V2-U PVC 450/750VWire

PVCInsulation, Rated Temperature90℃, rated voltage450/750V, compliantVDEStandard for fixed wiring
Request a QuoteView details
Cable Joint (Protection Box)
Lead Time: 7-15 days
Cable Accessories

Cable Joint (Protection Box)

10KVIncludes a protective housing with excellent corrosion resistance, sealing performance, and thermal conductivity. Designed to protect cable mid-splices, preventing breakdowns and explosion hazards.
Request a QuoteView details
JET3385 XLPE Wire
Lead Time: 7-15 days
JET Standard

JET3385 XLPEWire

XLPEInsulation, Rated Temperature110℃, rated voltage300V, compliant with JapanJETCertification Standards
Request a QuoteView details
MIL-W-81822-6A PEFE Military Specification
Lead Time: 7-15 days
road marking line

MIL-W-81822-6A PEFEroad marking

PEFEInsulation, Rated Temperature200°C, rated voltage300VMilitary-grade cables
Request a QuoteView details
Teflon Sleeve
Lead Time: 7-15 days
Fluoroplastic Pipe

Teflon Sleeve

PTFEMaterial: High transparency, chemically resistant; ideal for laboratory equipment.
Request a QuoteView details
SVG Static Var Generator
Lead Time: 7-15 days
Smart Capacitor Reactor

SVGStatic Var Generator

Dynamic reactive power compensation device with millisecond-level response to improve power factor and power quality.
Request a QuoteView details
Dry-type transformer
Lead Time: 7-15 days
Dry/Oil-immersed Transformer

Dry-type transformer

SCB11-18 10KVEpoxy Resin Cast Dry-Type Transformer – Low Loss, Low Noise. Ideal for Building and Industrial/Commercial Power Distribution.
Request a QuoteView details
1kV High-Voltage Instrument Transformer
Lead Time: 7-15 days
High-voltage instrument transformer

10KVHigh-voltage instrument transformer

10KVVoltage/Current Transformer, Epoxy-Resin Cast Insulation, Dual-Purpose for Metering and Protection
Request a QuoteView details
UL1007 PVC Electronic Wire
Lead Time: 7-15 days
PVC cable

UL1007 PVCelectron beam

PVCInsulate300V 80°CInternal wiring of electrical and electronic equipment
Request a QuoteView details
Inner silicone, outer fiberglass glass tube
Lead Time: 7-15 days
Fiberglass tube

Inner-silica, outer-fiber glass fiber tube

Inner silicone, outer fiber-braided construction for high-temperature resistance200°C, voltage level600V
Request a QuoteView details
High-voltage 15 switchgear XGN15-12
Lead Time: 7-15 days
High-voltage complete sets

High Voltage15CabinetXGN15-12

10-35kVHigh-voltage switch15Cabinet, suitable for box-type substations, power stations, and industrial and mining enterprise distribution systems.
Request a QuoteView details
PVC Insulating Sleeve
Lead Time: 7-15 days
PVC pipe

PVCInsulation Sleeve

PVC material, soft, wear-resistant, and voltage-resistant1.5kV, operating temperature -10°C~80°C
Request a QuoteView details
Doubly-walled tube with adhesive
Lead Time: 7-15 days
Double-wall pipe

Double-wall tube with adhesive

Inner Diameter: Φ3.2-125mmInner wall sealed with hot melt adhesive; outer layerXLEVAPolyolefin insulation, shrink ratio3:1or4:1Waterproof and moisture-proof
Request a QuoteView details
UL3633 XLPE Irradiated Wire
Lead Time: 7-15 days
XLPE wire

UL3633 XLPEIrradiation line

XLPEInsulate150°C 3KVcross-linked polyethylene cable
Request a QuoteView details
Busbar Heat Shrink Tubing Φ0.05-200mm
In Stock, Custom
Heat Shrink Tubing

Busbar Heat Shrink Tube Φ0.05-200mm

Inner Diameter:0.05-200mmVoltage Rating:1/10/24/35kV, Material:XLPEBusbar sleeve
Request a QuoteView details
Photovoltaic Grid-Connection Cabinet
Lead Time: 7-15 days
Photovoltaic Grid-Connection Cabinet

Photovoltaic Grid-Connection Cabinet

Grid-tied PV power generation cabinet, supports380V-10kVGrid connection, including inverter and grid switch
Request a QuoteView details
Silicone Sleeve Φ1-50mm
In Stock, Custom
Silicone Tube

Silicone Sleeve Φ1-50mm

Inner Diameter:1-50mmVoltage Rating:600V, Material: Silicone
Request a QuoteView details
Power Box
Lead Time: 7-15 days
Low-voltage switchgear

Power Box

Low-voltage power distribution cabinet, suitable for power distribution in industrial and mining enterprises.IP54Ingress Protection Rating
Request a QuoteView details
UL3644 Silicone Wire
Lead Time: 7-15 days
SR Silicone/Braided Cable

UL3644 sILICONESilicone Wire

sILICONESilicone rubber insulated200°C 1000V, silicone cable
Request a QuoteView details
Box-type/Medium-Voltage/European-type transformer
Lead Time: 7-15 days
Container Substation / Prefabricated Cabin

Pad-mounted transformer / American-style transformer / European-style transformer

Modular substation: integrated high-voltage room, transformer room, and low-voltage room. Outdoor pre-assembled substation.
Request a QuoteView details
UL1164 PTFE High-Temperature Wire
Lead Time: 7-15 days
Fluoroplastic wire

UL1164 PTFEHigh-temperature wire

PTFEInsulate600V 200°CHigh-temperature aviation wire
Request a QuoteView details
FHL2G Silicone Automotive Wire (German Standard)
Lead Time: 7-15 days
Automotive wire

FHL2G SiliconeGerman standard automotive wiring

SiliconeInsulation, Rated Temperature -40~180℃, rated voltage600V AC/1000V DC
Request a QuoteView details
UL2951 TPE Electronic Wire
Lead Time: 7-15 days
TPE cable

UL2951 TPEelectron beam

TPEInsulate105°C 300VThermoplastic elastomer cable
Request a QuoteView details
UL3035 NR Line
Lead Time: 7-15 days
NR/Neoprene Wire

UL3035 NRLine

NRChloroprene rubber insulation600V 90°COil-resistant rubber wire
Request a QuoteView details
UL3279 EPDM Wire
Lead Time: 7-15 days
EPDM wire

UL3279 EPDMLine

EPDMInsulate105°C 600VEPDM rubber cable
Request a QuoteView details
MTW/TEW 1015 PVC/Nylon Electronic Wire
Lead Time: 7-15 days
UL US Standard

MTW/TEW 1015 PVC/NYLONelectron beam

PVC/NYLONInsulate105°C 600V, power tools, machine tool cables
Request a QuoteView details
E-80/T PVC Wire 150V
Lead Time: 7-15 days
CQC National Standard

E-80/T PVCwire150V

PVCInsulate80°C 150V, ChinaCQCCertified wiring for export
Request a QuoteView details
Zhe ICP Be 2026029063 Hao-1